12 complete symptom paths42 guides and 60 questions in each1,460 Grade A articlesOne searchable, connected knowledge library140 official sourcesEvidence context with explicit limits
STRUCTURED EVIDENCE SESSION

Efflorescence: deposit location versus water route

Map deposit height, weather exposure, first damp edge and drying direction. Photograph before cleaning so the exit pattern is preserved.

Browser-local draftNo session answers are sent to the server. Evidence balanceScores organize observations; they are not probabilities. No repair authorizationStop signals override the ordinary workflow.
01
Freeze the evidence

Record the condition before interpreting it.

02
Evidence ledger

Mark what raises or weakens each route.

Leave unknown items unmarked. Contradictory observations are useful evidence.

1

Ground or foundation moisture moving by capillarity

Moisture rises through porous masonry and leaves salts where evaporation occurs.

0
Raises fit +2 each
Lowers fit −2 each
2

Rain entry through exterior masonry or joints

Wind-driven rain enters higher on the wall and exits at an interior evaporation zone.

0
Raises fit +2 each
Lowers fit −2 each
3

Local service water source

A pipe or condensate route feeds one masonry area and produces a concentrated salt deposit.

0
Raises fit +2 each
Lowers fit −2 each
03
Decision points

Change one condition at a time.

An answer changes investigation order; it does not prove a concealed condition.

1

Is the deposit a broad lower-wall band or a concentrated higher patch?

If yes: A lower band supports ground moisture; a high patch supports local or rain entry.

If no: Map the first damp edge during an active event.

2

Does the pattern change after rain or during dry-weather service use?

If yes: Use the trigger to separate exterior and interior sources.

If no: Continue long-term moisture mapping before repair.

Safety interlock

Stop signals override scoring.

Mark the stop state when any listed boundary is present. Do not create a better clue by increasing exposure.

  • Do not seal or paint over active moisture without identifying the route.
  • Use appropriate precautions before disturbing old masonry coatings or contaminated deposits.
05
Current conclusion

Explain what changed the ranking.